A Hyderabad infrastructure consultancy that designs and supervises railway, metro, road and water projects, almost entirely for government clients, is making an offer of ₹202.5 crore of new shares, to repay debt and fund a software subsidiary and two overseas subsidiaries, plus 6,750,000 shares sold by its founder Venkatachala Chakrapani Redla. Revenue grew from ₹438.1 crore in FY23 to ₹567.1 crore in FY25 and profit nearly tripled to ₹51.6 crore, but operating cash flow turned negative in FY25.
Aarvee Engineering Consultants IPO: key figures
From the offer document; each figure is cited in the study below. Placings are among the 231 mainboard issues newboard has studied
Growth
- Revenue CAGR FY23 to FY25
- 13.8%higher than 28% of studied issues
- PAT CAGR FY23 to FY25
- 68.9%higher than 60% of studied issues
- EBITDA margin FY23 → FY25
- 11.1% → 16.7%higher than 59% of studied issues
Issue
- Fresh issue
- ₹202.5 cr
- Offer for sale
- 6,750,000 shares by the promoter
Concentration
- Government and related entities
- 96.1% of FY25 revenue
- Top ten customers
- 57.4% of FY25 revenuehigher than 44% of studied issues
Balance sheet
- Debt to equity FY25
- 0.2×
- ROCE FY25
- 34.5%higher than 75% of studied issues
Worth reading
- Operating cash flow FY25
- −₹5.3 cr
- Related-party transactions FY25
- ₹12.6 cr
- Contingent liabilities
- ₹173.8 cr
- Cases against promoters
- 1 civil, not quantified
- Working-capital days FY25
- 84higher than 50% of studied issues
Share an interesting fact, not just a link
Pick one. The post writes itself, with the page the figure is on and the picture to go with it.
On this page (25 sections)
- Key figures
- The study
- At a glance
- The business, in plain words
- Where the money comes from
- The growth record
- What the growth is made of
- Earnings quality
- The balance sheet
- What the money is for
- Who is selling
- Promoters
- Who already owns it
- What changed just before the IPO
- Capacity and expansion
- Market size and industry structure
- Competitive position
- Peers the company named
- Risks, in plain words
- Litigation and regulatory matters
- Related-party transactions
- What the offer document does not say
- Five questions for management
- Before the IPO
- Questions answered
Aarvee Engineering Consultants Limited: what the offer document says
Published 1 Nov 2026 · 1,972 words · read from the DRHP
01At a glance
What the company does: infrastructure consultancy across the project lifecycle: feasibility studies, detailed project reports, pre-bid services, detailed design, project management, supervision, third-party inspection and lenders' engineering (DRHP p.25). It says it has undertaken over 2,750 projects in 20 countries, counting those of a proprietorship it acquired in 2007 (DRHP p.25).
Who pays it: government and government-related entities, 96.13% of FY25 revenue; the top ten clients were 57.40% (DRHP p.29). Railways and metro rail were 48.22% of FY25 revenue and overseas projects 12.50% (DRHP p.29).
Why it is raising money: ₹760.00 million to repay borrowings, ₹219.66 million to invest in the subsidiary SRA OSS, ₹348.10 million and ₹208.82 million to invest in overseas subsidiaries Aarvee Engineering Consultants Pty Ltd and Aarvee Associates Limited, and the rest for general purposes (DRHP p.26).
How fast it has grown: revenue from ₹4,381 million in FY23 to ₹5,170 million in FY24 and ₹5,671 million in FY25 (DRHP p.28).
The one thing to understand: steady, government-funded consulting work with improving margins, but cash tied up in receivables and guarantees. EBITDA margin rose from 11.13% to 16.65% over two years, while operating cash flow was negative ₹53.10 million in FY25 and bank guarantees outstanding were ₹1,670.20 million (DRHP p.30, DRHP p.93, DRHP p.162).
02The business, in plain words
An engineering consultancy is hired, mostly by government agencies, to plan and design infrastructure and then supervise contractors building it, charging fees under each contract.
A metro rail agency tenders general consultancy for a new line → Aarvee wins the contract → its engineers prepare designs and supervise the contractors on site → the agency pays fees as milestones are met, holding back retention money until completion.
It had 485 ongoing projects and 3,225 employees in FY25 (DRHP p.162).
Earnings equation: Profit ≈ fee income − engineer and staff cost − overheads − interest. EBITDA margin was 16.65% in FY25 (DRHP p.162).
03Where the money comes from
| Share of revenue | FY23 | FY24 | FY25 |
|---|---|---|---|
| Government and related entities | 97.32% | 94.77% | 96.13% |
| Railways and metro rail | 46.69% | 47.11% | 48.22% |
| Overseas projects | 5.98% | 7.46% | 12.50% |
| Top ten clients | 77.31% | 67.98% | 57.40% |
Source: DRHP p.29.
04The growth record
| ₹ million, restated consolidated | FY23 | FY24 | FY25 |
|---|---|---|---|
| Revenue from operations | 4,381.42 | 5,170.01 | 5,671.32 |
| EBITDA | 487.46 | 727.55 | 944.35 |
| EBITDA margin | 11.13% | 14.07% | 16.65% |
| Profit after tax | 180.81 | 408.55 | 515.95 |
| Cash from operations | 293.39 | 264.15 | (53.10) |
Source: DRHP p.28, DRHP p.93, DRHP p.162.
05What the growth is made of
Steady order inflow. New orders were ₹5,779 million in FY23, ₹6,271 million in FY24 and ₹6,771 million in FY25, and the order book grew from ₹14,309 million in FY23 to ₹17,630 million at March 2025 and ₹22,749 million at June 2025 (DRHP p.46, DRHP p.162). Overseas work doubled as a share of revenue over two years (DRHP p.29).
06Earnings quality
Operating cash flow over FY23 to FY25 was ₹504.44 million against profit of ₹1,105.31 million (our arithmetic, DRHP p.28, DRHP p.93). Taxes paid rose to ₹285.23 million in FY25 (DRHP p.93). Debtor days were 104 in FY23, 97 in FY24 and 100 in FY25, and net working capital days rose from 41 in FY23 to 84 in FY25 (DRHP p.162). Return on capital employed was 22.09%, 30.21% and 34.54% (DRHP p.162). Clients retain part of the fees until projects are completed (DRHP p.30).
07The balance sheet
| ₹ million | Mar 2023 | Mar 2024 | Mar 2025 |
|---|---|---|---|
| Net worth | 1,479.58 | 1,901.74 | 2,383.76 |
| Total borrowings | 539.87 | 365.83 | 565.59 |
| Debt to equity | 0.36 | 0.19 | 0.24 |
Source: DRHP p.28, DRHP p.162. Contingent liabilities at March 2025 included ₹1,670.20 million of guarantees outstanding and ₹67.32 million of disputed GST input credit (DRHP p.30).
08What the money is for
| Use of net proceeds | ₹ million |
|---|---|
| Repay borrowings | 760.00 |
| Aarvee Engineering Consultants Pty Ltd | 348.10 |
| SRA OSS | 219.66 |
| Aarvee Associates Limited | 208.82 |
| General corporate purposes | not yet stated |
Source: DRHP p.26. A pre-IPO placement of up to ₹405 million may be made before the RHP (DRHP p.26). SRA OSS India, a Telangana software company, was acquired on 31 December 2024 in exchange for the company's shares (DRHP p.459).
09Who is selling
| Seller | Shares offered | Holding before the offer |
|---|---|---|
| Venkatachala Chakrapani Redla (promoter) | up to 6,750,000 | 87.74% |
Source: DRHP p.27, and the cover page. The shares offered are about 15.7% of the company's equity (our arithmetic). The average cost of the seller's shares is ₹0.26 each (DRHP p.32).
10Promoters
The DRHP names Venkatachala Chakrapani Redla and Sneha Redla as promoters (DRHP p.27); the December 2025 addendum adds Redla Nagarjun (addendum, page 2). Venkatachala Chakrapani Redla was paid ₹42.00 million a year in FY23 to FY25 (DRHP p.31). In FY25 the company paid ₹126.38 million to Nirmala Kola, a promoter-group member, as consideration for acquiring subsidiaries, and owed ₹77.09 million to Nirmala Kola in loans at March 2025 (DRHP p.31, DRHP p.32).
11Who already owns it
| Holder, before the offer | Share |
|---|---|
| Venkatachala Chakrapani Redla | 87.74% |
| Sneha Redla | 4.86% |
| Redla Nagarjun | 2.73% |
| Others | 4.67% |
Source: DRHP p.27. The last row is our arithmetic.
12What changed just before the IPO
- Share allotment: in March 2025 the promoters were allotted 32,408,400, 1,794,000 and 1,008,000 shares at no cost, as share capital rose from ₹60 million to ₹420 million (DRHP p.28, DRHP p.33).
- Acquisitions: SRA OSS acquired in December 2024; subsidiaries acquired from a promoter-group member in FY25 (DRHP p.31, DRHP p.459).
- Promoters: Redla Nagarjun reclassified as a promoter by the December 2025 addendum (addendum, page 2).
- Bonus: the March 2025 allotment was a bonus issue of 36,000,000 shares, six for every one held, on 29 March 2025, and was the last allotment before the offer (DRHP p.117).
- Public company: the company was converted into a public company in February 2025, the registrar issuing a fresh certificate of incorporation on 6 February 2025 (DRHP p.3).
- Auditor: there has been no change of statutory auditor in the three years before the filing (DRHP p.99).
13Capacity and expansion
Capacity is engineers: 3,225 employees in FY25, with attrition down to 12.26% (DRHP p.162). The proceeds fund two overseas subsidiaries and the software subsidiary (DRHP p.26).
14Market size and industry structure
The ICRA report cited in the offer document describes infrastructure capital spending as central to India's growth (DRHP p.25). The summary read gives no market-size figures.
15Competitive position
What the document claims, and what it rests on:
- Full-lifecycle services from feasibility to supervision (DRHP p.25).
- A diversified order book across 485 projects and many states (DRHP p.47, DRHP p.162).
Against that: dependence on government clients, on railways and metro, on tenders, on staff, and on guarantees and retention money (DRHP p.29, DRHP p.30).
16Peers the company named
| Company, FY25 | Total income, ₹ mn | P/E | RoNW |
|---|---|---|---|
| Aarvee Engineering Consultants | 5,743.08 | - | 24.08% |
| RITES | 23,235.20 | 33.03 | 15.49% |
| Engineers India | 32,478.44 | 20.12 | 23.59% |
Source: DRHP p.28, DRHP p.161, DRHP p.162. The company figure is return on equity from the KPI table. The peers' average P/E is 26.58 (DRHP p.160).
No P/E is possible for the company until a price band is set.
17Risks, in plain words
- Government. 96% of FY25 revenue (DRHP p.29).
- Railways and metro. Nearly half of revenue (DRHP p.29).
- Overseas. 12.5% of revenue and growing (DRHP p.29).
- Guarantees. Performance guarantees can be invoked (DRHP p.30).
- Retention. Clients hold back money until completion (DRHP p.30).
18Litigation and regulatory matters
| Proceedings outstanding | Count | ₹ million |
|---|---|---|
| Against the company, tax, civil | 6, 1 | 15.37 |
| Against subsidiaries, tax | 1 | 0.12 |
| Against promoters, civil | 1 | not quantified |
Source: DRHP p.28, DRHP p.29.
20What the offer document does not say
In the sections read for this study, the document does not give:
- Which subsidiaries were acquired from Nirmala Kola, and how the ₹126.38 million price was set, in the pages read.
- What the overseas subsidiaries will do with ₹556.92 million (our arithmetic), in the pages read.
- Why FY25 operating cash flow turned negative, in the pages read.
- Who the top ten clients are, in the pages read.
- The price band, lot size or issue dates, which is normal at DRHP stage.
21Five questions for management
- Which subsidiaries were bought from a promoter-group member, and on what valuation?
- Why does a software subsidiary acquired for company shares need ₹219.66 million?
- What will the two overseas subsidiaries spend ₹556.92 million on?
- How much retention money is held back by clients?
- Why was Redla Nagarjun added as a promoter after filing?
1Sources and cited facts
This study was read from 1 document the company filed. The 56 figures it cites are listed under the document each came from, with the page and the sentence as printed.
Show all 56 cited facts, with the page and the sentence as printedHide the cited facts
- 1At a glanceWhat the company does, infrastructure consultancy across the project lifecycle: feasibility studies, detailed project reports, pre-bid services, detailed design, project management, supervision, third-party inspection and lenders' engineering (DRHP p.25).p.25
“What the company does, infrastructure consultancy across the project lifecycle: feasibility studies, detailed project reports, pre-bid services, detailed design, project management, supervision, third-party inspection and lenders' engineering (DRHP p.25).”
- 2At a glanceIt says it has undertaken over 2,750 projects in 20 countries, counting those of a proprietorship it acquired in 2007 (DRHP p.25).p.25
“It says it has undertaken over 2,750 projects in 20 countries, counting those of a proprietorship it acquired in 2007 (DRHP p.25).”
- 3At a glanceWho pays it, government and government-related entities, 96.13% of FY25 revenue; the top ten clients were 57.40% (DRHP p.29).p.29
“Who pays it, government and government-related entities, 96.13% of FY25 revenue; the top ten clients were 57.40% (DRHP p.29).”
- 4At a glanceRailways and metro rail were 48.22% of FY25 revenue and overseas projects 12.50% (DRHP p.29).p.29
“Railways and metro rail were 48.22% of FY25 revenue and overseas projects 12.50% (DRHP p.29).”
- 5At a glanceWhy it is raising money, ₹760.00 million to repay borrowings, ₹219.66 million to invest in the subsidiary SRA OSS, ₹348.10 million and ₹208.82 million to invest in overseas subsidiaries Aarvee Engineering Consultants Pty Ltd and Aarvee Associates Limited, and the rest for general purposes (DRHP p.2p.26
“Why it is raising money, ₹760.00 million to repay borrowings, ₹219.66 million to invest in the subsidiary SRA OSS, ₹348.10 million and ₹208.82 million to invest in overseas subsidiaries Aarvee Engineering Consultants Pty Ltd and Aarvee Associates Limited, and the rest for general purposes (DRHP p.26).”
- 6At a glanceHow fast it has grown, revenue from ₹4,381 million in FY23 to ₹5,170 million in FY24 and ₹5,671 million in FY25 (DRHP p.28).p.28
“How fast it has grown, revenue from ₹4,381 million in FY23 to ₹5,170 million in FY24 and ₹5,671 million in FY25 (DRHP p.28).”
- 7The business, in plain wordsIt had 485 ongoing projects and 3,225 employees in FY25 (DRHP p.162).p.162
“It had 485 ongoing projects and 3,225 employees in FY25 (DRHP p.162).”
- 8
“EBITDA margin was 16.65% in FY25 (DRHP p.162).”
- 9What the growth is made ofOverseas work doubled as a share of revenue over two years (DRHP p.29).p.29
“Overseas work doubled as a share of revenue over two years (DRHP p.29).”
- 10
“Taxes paid rose to ₹285.23 million in FY25 (DRHP p.93).”
- 11Earnings qualityDebtor days were 104 in FY23, 97 in FY24 and 100 in FY25, and net working capital days rose from 41 in FY23 to 84 in FY25 (DRHP p.162).p.162
“Debtor days were 104 in FY23, 97 in FY24 and 100 in FY25, and net working capital days rose from 41 in FY23 to 84 in FY25 (DRHP p.162).”
- 12
“Return on capital employed was 22.09%, 30.21% and 34.54% (DRHP p.162).”
- 13
“Clients retain part of the fees until projects are completed (DRHP p.30).”
- 14The balance sheetContingent liabilities at March 2025 included ₹1,670.20 million of guarantees outstanding and ₹67.32 million of disputed GST input credit (DRHP p.30).p.30
“Contingent liabilities at March 2025 included ₹1,670.20 million of guarantees outstanding and ₹67.32 million of disputed GST input credit (DRHP p.30).”
- 15What the money is forA pre-IPO placement of up to ₹405 million may be made before the RHP (DRHP p.26).p.26
“A pre-IPO placement of up to ₹405 million may be made before the RHP (DRHP p.26).”
- 16What the money is forSRA OSS India, a Telangana software company, was acquired on 31 December 2024 in exchange for the company's shares (DRHP p.459).p.459
“SRA OSS India, a Telangana software company, was acquired on 31 December 2024 in exchange for the company's shares (DRHP p.459).”
- 17
“The average cost of the seller's shares is ₹0.26 each (DRHP p.32).”
- 18PromotersThe DRHP names Venkatachala Chakrapani Redla and Sneha Redla as promoters (DRHP p.27); the December 2025 addendum adds Redla Nagarjun (addendum, page 2).p.27
“The DRHP names Venkatachala Chakrapani Redla and Sneha Redla as promoters (DRHP p.27); the December 2025 addendum adds Redla Nagarjun (addendum, page 2).”
- 19PromotersVenkatachala Chakrapani Redla was paid ₹42.00 million a year in FY23 to FY25 (DRHP p.31).p.31
“Venkatachala Chakrapani Redla was paid ₹42.00 million a year in FY23 to FY25 (DRHP p.31).”
- 20What changed just before the IPOBonus, the March 2025 allotment was a bonus issue of 36,000,000 shares, six for every one held, on 29 March 2025, and was the last allotment before the offer (DRHP p.117).p.117
“Bonus, the March 2025 allotment was a bonus issue of 36,000,000 shares, six for every one held, on 29 March 2025, and was the last allotment before the offer (DRHP p.117).”
- 21What changed just before the IPOPublic company, the company was converted into a public company in February 2025, the registrar issuing a fresh certificate of incorporation on 6 February 2025 (DRHP p.3).p.3
“Public company, the company was converted into a public company in February 2025, the registrar issuing a fresh certificate of incorporation on 6 February 2025 (DRHP p.3).”
- 22What changed just before the IPOAuditor, there has been no change of statutory auditor in the three years before the filing (DRHP p.99).p.99
“Auditor, there has been no change of statutory auditor in the three years before the filing (DRHP p.99).”
- 23Capacity and expansionCapacity is engineers: 3,225 employees in FY25, with attrition down to 12.26% (DRHP p.162).p.162
“Capacity is engineers: 3,225 employees in FY25, with attrition down to 12.26% (DRHP p.162).”
- 24Capacity and expansionThe proceeds fund two overseas subsidiaries and the software subsidiary (DRHP p.26).p.26
“The proceeds fund two overseas subsidiaries and the software subsidiary (DRHP p.26).”
- 25Market size and industry structureThe ICRA report cited in the offer document describes infrastructure capital spending as central to India's growth (DRHP p.25).p.25
“The ICRA report cited in the offer document describes infrastructure capital spending as central to India's growth (DRHP p.25).”
- 26
“Full-lifecycle services from feasibility to supervision (DRHP p.25).”
- 27
“The peers' average P/E is 26.58 (DRHP p.160).”
- 28
“Government. 96% of FY25 revenue (DRHP p.29).”
- 29
“Railways and metro. Nearly half of revenue (DRHP p.29).”
- 30
“Overseas. 12.5% of revenue and growing (DRHP p.29).”
- 31
“Guarantees. Performance guarantees can be invoked (DRHP p.30).”
- 32
“Retention. Clients hold back money until completion (DRHP p.30).”
- 33Related-party transactionsBeyond the payments to Nirmala Kola and the promoter's remuneration, a subsidiary, Nag Infrastructure Consulting Engineers, has an unsecured 12% loan of ₹70.00 million from Nirmala Kola (DRHP p.72).p.72
“Beyond the payments to Nirmala Kola and the promoter's remuneration, a subsidiary, Nag Infrastructure Consulting Engineers, has an unsecured 12% loan of ₹70.00 million from Nirmala Kola (DRHP p.72).”
- 34
“Growth | EBITDA margin FY23 → FY25 | 11.1% → 16.7% | (DRHP p.162)”
- 35
“Issue | Fresh issue | ₹202.5 cr | (DRHP p.25)”
- 36
“Issue | Offer for sale | 6,750,000 shares by the promoter | (DRHP p.25)”
- 37Key figuresConcentration | Government and related entities | 96.1% of FY25 revenue | (DRHP p.29)p.29
“Concentration | Government and related entities | 96.1% of FY25 revenue | (DRHP p.29)”
- 38
“Concentration | Top ten customers | 57.4% of FY25 revenue | (DRHP p.29)”
- 39
“Balance sheet | Debt to equity FY25 | 0.2× | (DRHP p.162)”
- 40
“Balance sheet | ROCE FY25 | 34.5% | (DRHP p.162)”
- 41
“Worth reading | Operating cash flow FY25 | −₹5.3 cr | (DRHP p.93)”
- 42
“Worth reading | Related-party transactions FY25 | ₹12.6 cr | (DRHP p.31)”
- 43
“Worth reading | Cases against promoters | 1 civil, not quantified | (DRHP p.29)”
- 44
“Worth reading | Working-capital days FY25 | 84 | (DRHP p.162)”
- 45
“Before the IPO | Revenue FY23 → FY25 | ₹438.1 cr → ₹567.1 cr | (DRHP p.28)”
- 46
“Before the IPO | PAT FY23 → FY25 | ₹18.1 cr → ₹51.6 cr | (DRHP p.28)”
- 47
“Before the IPO | Receivable days FY23 → FY25 | 104 → 100 | (DRHP p.162)”
- 48
“Before the IPO | Promoter remuneration FY23 → FY25 | ₹4.2 cr → ₹4.2 cr | (DRHP p.31)”
- 49
“Before the IPO | Bonus issue | 6:1, March 2025 | (DRHP p.117)”
- 50Key figuresBefore the IPO | Last allotment before the IPO | nil consideration, bonus issue, March 2025 | (DRHP p.117)p.117
“Before the IPO | Last allotment before the IPO | nil consideration, bonus issue, March 2025 | (DRHP p.117)”
- 51
“Before the IPO | Auditor change | none in the last three years | (DRHP p.99)”
- 52
“Before the IPO | Converted to a public company | February 2025 | (DRHP p.3)”
- 53
“Who is involved | Industry | Construction and infrastructure | (DRHP p.25)”
- 54
“Who is involved | Promoter | Venkatachala Chakrapani Redla | (DRHP p.27)”
- 55
“Who is involved | Promoter | Sneha Redla | (DRHP p.27)”
- 56Key figuresWho is involved | Selling shareholder | Venkatachala Chakrapani Redla (promoter), 6,750,000 shares | (DRHP p.25)p.25
“Who is involved | Selling shareholder | Venkatachala Chakrapani Redla (promoter), 6,750,000 shares | (DRHP p.25)”
Aarvee Engineering Consultants IPO: before the IPO
The record up to the issue and what changed in the company's capital and auditors, from the offer document.
- Revenue FY23 → FY25
- ₹438.1 cr → ₹567.1 cr
- PAT FY23 → FY25
- ₹18.1 cr → ₹51.6 cr
- Receivable days FY23 → FY25
- 104 → 100
- Promoter remuneration FY23 → FY25
- ₹4.2 cr → ₹4.2 cr
- Bonus issue
- 6:1, March 2025
- Last allotment before the IPO
- nil consideration, bonus issue, March 2025
- Auditor change
- none in the last three years
- Converted to a public company
- February 2025
Aarvee Engineering Consultants IPO: checks
Factual conditions, each with a fixed threshold, read from the key figures. A condition met is a fact to read up on in the study, not a verdict on the issue; meeting none is not a verdict either.
- Profit grew much faster than revenue
Profit grew 68.9% a year against revenue's 13.8%.
- Operating cash flow negative
Operating cash flow was −₹5.3 cr in the latest year.
- Cases against promoters
Cases against promoters: 1 civil, not quantified.
Aarvee Engineering Consultants IPO: questions answered
When will the Aarvee Engineering Consultants IPO open?
No dates or price band yet. The company filed its draft offer document on 25 Sept 2025. The dates and the band come with the red herring prospectus, after SEBI has reviewed the draft.
What are Aarvee Engineering Consultants's financials?
Revenue went ₹438.1 cr to ₹567.1 cr (FY23 to FY25), 13.8% a year. Profit after tax went ₹18.1 cr to ₹51.6 cr (FY23 to FY25), 68.9% a year. All figures are from the offer document's restated statements.
How much of Aarvee Engineering Consultants's revenue comes from its largest customer?
The top ten customers 57.4% of FY25 revenue, as the offer document gives it. The study shows the years before and whether the customers are named.
Is the Aarvee Engineering Consultants IPO a fresh issue or an offer for sale?
A fresh issue of ₹203 crore, which goes to the company, and an offer for sale of 6,750,000 shares by the promoter, which goes to the shareholders selling.
What is the Aarvee Engineering Consultants IPO GMP?
newboard does not publish a grey-market premium. Grey-market deals happen outside the stock exchanges, are not regulated, and leave no public record of who traded at what price. What is on record is the offer document, read on this page, and the exchanges' bid book.
Aarvee Engineering Consultants IPO: the next step, on Telegram
A message when there is news on its price band, bidding, allotment status, listing day and use-of-proceeds reports. Free, no account, leave in one tap. Send /stop to end it.
Not on this page yet: the peer table the issuer printed. Each is added when the pipeline extracts it from the offer document.
The figures on this page are the company's own, taken from its filings with the exchanges and SEBI, and every number links to the document and page it came from. They are reproduced as stated, not verified independently, and they are not forecasts by newboard.in. Nothing here is investment advice, a research report or a recommendation. newboard.in is not a SEBI-registered research analyst or investment adviser.