Krishna Buildspace Limited IPO
Construction and infrastructure · DRHP 30 Dec 2025
Follow this IPOband, bidding, allotment and listing, on Telegram
- DRHP filed
- 30 Dec 2025
An Ahmedabad building contractor that constructs institutional, industrial, residential and waste-management projects, mostly for public sector undertakings, is issuing up to 9,000,000 new shares, mainly for ₹80.0 crore of working capital, while two promoters offer 900,000. Revenue rose from ₹164.8 crore in FY23 to ₹183.3 crore in FY25, but operating cash flow over the period was negative, net working capital days rose from 66 to 171, and ten customers provide over 90% of revenue.
Krishna Buildspace IPO: key figures
From the offer document; each figure is cited in the study below. Placings are among the 231 mainboard issues newboard has studied
Growth
- Revenue CAGR FY23 to FY25
- 5.5%higher than 9% of studied issues
- PAT CAGR FY23 to FY25
- 42.0%higher than 45% of studied issues
- EBITDA margin FY23 → FY25
- 9.5% → 15.5%higher than 53% of studied issues
Issue
- Fresh issue
- 9,000,000 shares, price not set
- Offer for sale
- 900,000 shares by two promoters
Concentration
- Top ten customers
- 92.9% of FY25 revenuehigher than 88% of studied issues
- Public sector undertakings
- 73.2% of FY25 revenue
Balance sheet
- Debt to equity FY25
- 1.3×
Worth reading
- Operating cash flow FY25
- ₹1.7 cr
- Receivables more than six months overdue, September 2025
- ₹15.2 cr
- Cases against promoters
- 1 criminal, ₹0.6 cr
- Working-capital days FY25
- 153higher than 80% of studied issues
Share an interesting fact, not just a link
Pick one. The post writes itself, with the page the figure is on and the picture to go with it.
On this page (25 sections)
- Key figures
- The study
- At a glance
- The business, in plain words
- Where the money comes from
- The growth record
- What the growth is made of
- Earnings quality
- The balance sheet
- What the money is for
- Who is selling
- Promoters
- Who already owns it
- What changed just before the IPO
- Capacity and expansion
- Market size and industry structure
- Competitive position
- Peers the company named
- Risks, in plain words
- Litigation and regulatory matters
- Related-party transactions
- What the offer document does not say
- Five questions for management
- Before the IPO
- Questions answered
Krishna Buildspace Limited: what the offer document says
Published 7 Nov 2026 · 2,195 words · read from the DRHP
01At a glance
What the company does: design, engineering and construction of buildings and related works on an end-to-end basis, with three subsidiaries covering electrical and wastewater work (DRHP p.33, DRHP p.223, DRHP p.266). It has executed 82 projects across 8 states in the last decade, worth ₹6,392.54 million (DRHP p.223).
Who pays it: public sector undertakings were 78.74% of revenue in the six months to September 2025, up from 49.86% in FY23 (DRHP p.37). The top ten customers were 93.54% of revenue, and Gujarat 40.74% (DRHP p.38).
Why it is raising money: ₹800.00 million for working capital, ₹52.00 million for equipment and machinery, and the rest for general purposes (DRHP p.34).
How fast it has grown: revenue from ₹1,647.61 million in FY23 to ₹1,832.87 million in FY25, and ₹959.53 million in the six months to September 2025 (DRHP p.35).
The one thing to understand: a contractor whose profits are tied up in receivables. Net working capital days rose from 66 in FY23 to 171 in the six months, ₹151.90 million of receivables were more than six months past due, and operating cash flow totalled negative ₹180.03 million from FY23 to September 2025 against ₹427.53 million of profit (DRHP p.37, DRHP p.152, DRHP p.418, our arithmetic).
02The business, in plain words
A building contractor bids for construction projects, designs and builds them with its own teams and subsidiaries, and bills the client as work progresses. Clients hold back retention money and require bank guarantees, and public bodies often pay late.
A public sector undertaking tenders for a new institutional campus → Krishna Buildspace bids lowest and wins → it designs, builds and fits out the buildings, with electrical and plumbing work by its subsidiaries → it bills stage by stage and waits for the client to certify and pay.
The company had ₹375.79 million of bank guarantees outstanding at September 2025 (DRHP p.38). It began as the partnership firm Krishna Developers, and the summary says it was established in 1995 (DRHP p.33, DRHP p.122).
Earnings equation: Profit ≈ work billed × (contract margin) − interest on working capital. EBITDA was 17.50% of total income in the six months (DRHP p.152).
03Where the money comes from
| Revenue, ₹ million | FY23 | FY24 | FY25 | H1 FY26 |
|---|---|---|---|---|
| Institutional | 317.55 | 728.80 | 1,004.04 | 393.59 |
| Industrial | 741.04 | 419.85 | 129.95 | 222.08 |
| Waste management | 291.50 | 254.45 | 257.43 | 100.59 |
| Residential | 133.67 | 52.00 | 201.97 | 138.75 |
| Commercial | - | 146.59 | 196.46 | 98.74 |
Source: DRHP p.225. Infrastructure makes up the rest. H1 FY26 is six months.
| Share of revenue | FY23 | FY24 | FY25 | H1 FY26 |
|---|---|---|---|---|
| Public sector undertakings | 49.86% | 66.22% | 73.17% | 78.74% |
| Top ten customers | 87.39% | 92.16% | 92.87% | 93.54% |
| Gujarat | 29.01% | 32.07% | 35.70% | 40.74% |
Source: DRHP p.37, DRHP p.38.
04The growth record
| ₹ million, restated consolidated | FY23 | FY24 | FY25 | H1 FY26 |
|---|---|---|---|---|
| Revenue from operations | 1,647.61 | 1,720.83 | 1,832.87 | 959.53 |
| EBITDA | 156.45 | 225.20 | 284.14 | 168.87 |
| Profit after tax | 74.94 | 113.00 | 151.01 | 88.58 |
| Cash from operations | 11.57 | (106.70) | 16.65 | (101.55) |
| Net working capital days | 66 | 111 | 153 | 171 |
Source: DRHP p.35, DRHP p.152, DRHP p.418. H1 FY26 is six months. EBITDA margin, measured on total income, rose from 9.46% in FY23 to 17.50% (DRHP p.152).
05What the growth is made of
Margin more than volume. Revenue grew 11% from FY23 to FY25 while profit doubled (our arithmetic, DRHP p.35). The mix moved from industrial to institutional work, and towards PSU clients (DRHP p.37, DRHP p.225). The order book has since shifted the other way: private-sector clients were 65.69% of the ₹4,649.62 million order book at September 2025, up from 25.98% in FY23 (DRHP p.232, DRHP p.233).
06Earnings quality
Profit is not turning into cash. Across FY23 to September 2025 the company reported ₹427.53 million of profit and negative ₹180.03 million of operating cash flow (our arithmetic, DRHP p.35, DRHP p.418). Trade receivables were ₹543.84 million at September 2025, of which 27.93% was more than six months past due (DRHP p.37). There are no auditor qualifications that have not been given effect in the restated accounts (DRHP p.36).
07The balance sheet
| ₹ million | Mar 2023 | Mar 2024 | Mar 2025 | Sep 2025 |
|---|---|---|---|---|
| Net worth | 186.52 | 297.95 | 460.73 | 544.50 |
| Total borrowings | 377.87 | 521.72 | 594.59 | 692.71 |
| Debt to equity | 2.03 | 1.75 | 1.29 | 1.27 |
Source: DRHP p.35, DRHP p.36, DRHP p.152.
Cash and cash equivalents were ₹4.67 million at September 2025 (DRHP p.418).
08What the money is for
| Use of net proceeds | ₹ million |
|---|---|
| Working capital | 800.00 |
| Equipment and machinery | 52.00 |
| General corporate purposes | not yet stated |
Source: DRHP p.34.
09Who is selling
| Seller | Holding before the offer |
|---|---|
| Mohanbhai Chanabhai Sorathiya (promoter) | 15.87% |
| Jayantibhai Chanabhai Sorathia (promoter) | 15.87% |
Source: DRHP p.34. Together they offer up to 900,000 shares; the split was not read for this study (DRHP p.33).
10Promoters
The promoters are Sandip Mohanbhai Sorathia, Harsukhbhai Oghadbhai Bhanderi, Pankajbhai Haribhai Bhanderi, Pravinbhai Chanabhai Sorathia, Mohanbhai Chanabhai Sorathiya and Jayantibhai Chanabhai Sorathia (DRHP p.33). One criminal proceeding involving ₹6.00 million is pending against the promoters (DRHP p.37).
11Who already owns it
| Holder, before the offer | Share |
|---|---|
| Five promoters, 15.87% each | 79.35% |
| Pankajbhai Haribhai Bhanderi | 15.59% |
| Kapilaben Pankajkumar Bhanderi (promoter group) | 0.29% |
| Seven investors from the November 2025 placement | 4.76% |
Source: DRHP p.34, DRHP p.129. The first row is our arithmetic.
12What changed just before the IPO
- Bonus issue: 28 bonus shares for each share held, allotted on 17 October 2025 (DRHP p.121).
- Private placement: 1,450,621 shares at ₹81 on 20 November 2025, about ₹117.5 million, 1,234,567 of them to Priyanka Shwetkumar Koradiya (DRHP p.122, our arithmetic).
- Shareholders' agreement: a share subscription and shareholders' agreement dated 15 November 2025 (DRHP p.266).
- Order book: ₹5,241.74 million across 19 ongoing projects at 15 December 2025 (DRHP p.38, DRHP p.223).
- Auditor: no change of statutory auditor in the three years before the filing; S. C. Makhecha & Associates was reappointed in September 2024 (DRHP p.113).
- Company form: the company became a public limited company in September 2025 (DRHP p.522).
13Capacity and expansion
Capacity is site teams, equipment and working capital. The proceeds fund working capital and ₹52 million of equipment (DRHP p.34). The book-to-bill ratio was 1.68 in FY25 (DRHP p.152).
14Market size and industry structure
The ICRA report cited in the offer document says India's construction market grew at 15.6% a year from FY2021 to FY2025 and projects 7.9% a year from FY2026 to FY2030 (DRHP p.33). Those projections are ICRA's, and newboard has not tested them.
15Competitive position
What the document claims, and what it rests on:
- An integrated model: design through execution in-house, with subsidiaries for specialised work (DRHP p.33, DRHP p.223).
- A track record: 82 projects over the last decade (DRHP p.223).
Against that: dependence on competitive tenders and ten customers, one state for 41% of revenue, slow collections, and a Gujarat road-and-building department order against its contractor registration (DRHP p.37, DRHP p.38, DRHP p.55).
16Peers the company named
| Company, FY25 consolidated | Revenue, ₹ mn | P/E | RoNW |
|---|---|---|---|
| Krishna Buildspace | 1,832.87 | - | 32.78% |
| Ahluwalia Contracts (India) | 40,986.23 | 31.78 | 11.24% |
| B. L. Kashyap & Sons | 11,536.33 | 42.62 | 5.25% |
| Globe Civil Projects | 3,785.76 | 10.74 | 22.63% |
| Garuda Construction & Engineering | 2,256.74 | 33.40 | 14.98% |
Source: DRHP p.151. Peer P/E uses prices on 17 December 2025.
No P/E is possible for the company until a price band is set.
17Risks, in plain words
- Tenders. Most projects are won by competitive bidding (DRHP p.37).
- PSU dependence. 79% of recent revenue (DRHP p.37).
- Receivables. 28% more than six months overdue (DRHP p.37).
- Customers. Ten customers were 94% of revenue (DRHP p.38).
- Gujarat. 41% of revenue (DRHP p.38).
- Registration. A state order placing its road-and-building registration in abeyance, stayed by the High Court (DRHP p.55, DRHP p.56).
18Litigation and regulatory matters
| Proceedings outstanding | Count | ₹ million |
|---|---|---|
| By the company, regulatory, other material | 1, 1 | 7.62 |
| Against the company, tax | 3 | 55.58 |
| Against promoters, criminal | 1 | 6.00 |
Source: DRHP p.36, DRHP p.37. In May 2024 the Navsari division of Gujarat's Road and Building Department issued a show-cause notice over security deposits not furnished on four works awarded in 2021, and in August 2024 placed the company's 'AA' class registration in abeyance and barred new road and building works for three years; the company challenged this in the Gujarat High Court, which has granted interim relief (DRHP p.55, DRHP p.56). The company says the order covers road works in Gujarat that are not part of its current order book (DRHP p.56).
20What the offer document does not say
In the sections read for this study, the document does not give:
- Who the ten customers are, which together provide over 90% of revenue.
- Which PSU accounts are overdue, and why receivables past six months rose to ₹151.90 million.
- Who Priyanka Shwetkumar Koradiya is, or what the November 2025 shareholders' agreement grants, in the pages read.
- What the criminal proceeding against the promoters concerns, in the pages read.
- The price band, lot size or issue dates, which is normal at DRHP stage.
21Five questions for management
- Which customers make up the top ten, and how quickly does each pay?
- What are the ₹151.90 million of receivables more than six months overdue, and how much is disputed?
- Why has operating cash flow been negative in two of the last four periods while profit rose?
- What rights does the November 2025 shareholders' agreement give the new investors?
- How will the order book's shift to private clients change margins and payment terms?
1Sources and cited facts
This study was read from 1 document the company filed. The 54 figures it cites are listed under the document each came from, with the page and the sentence as printed.
Show all 54 cited facts, with the page and the sentence as printedHide the cited facts
- 1At a glanceIt has executed 82 projects across 8 states in the last decade, worth ₹6,392.54 million (DRHP p.223).p.223
“It has executed 82 projects across 8 states in the last decade, worth ₹6,392.54 million (DRHP p.223).”
- 2At a glanceWho pays it, public sector undertakings were 78.74% of revenue in the six months to September 2025, up from 49.86% in FY23 (DRHP p.37).p.37
“Who pays it, public sector undertakings were 78.74% of revenue in the six months to September 2025, up from 49.86% in FY23 (DRHP p.37).”
- 3
“The top ten customers were 93.54% of revenue, and Gujarat 40.74% (DRHP p.38).”
- 4At a glanceWhy it is raising money, ₹800.00 million for working capital, ₹52.00 million for equipment and machinery, and the rest for general purposes (DRHP p.34).p.34
“Why it is raising money, ₹800.00 million for working capital, ₹52.00 million for equipment and machinery, and the rest for general purposes (DRHP p.34).”
- 5At a glanceHow fast it has grown, revenue from ₹1,647.61 million in FY23 to ₹1,832.87 million in FY25, and ₹959.53 million in the six months to September 2025 (DRHP p.35).p.35
“How fast it has grown, revenue from ₹1,647.61 million in FY23 to ₹1,832.87 million in FY25, and ₹959.53 million in the six months to September 2025 (DRHP p.35).”
- 6The business, in plain wordsThe company had ₹375.79 million of bank guarantees outstanding at September 2025 (DRHP p.38).p.38
“The company had ₹375.79 million of bank guarantees outstanding at September 2025 (DRHP p.38).”
- 7
“EBITDA was 17.50% of total income in the six months (DRHP p.152).”
- 8The growth recordEBITDA margin, measured on total income, rose from 9.46% in FY23 to 17.50% (DRHP p.152).p.152
“EBITDA margin, measured on total income, rose from 9.46% in FY23 to 17.50% (DRHP p.152).”
- 9Earnings qualityTrade receivables were ₹543.84 million at September 2025, of which 27.93% was more than six months past due (DRHP p.37).p.37
“Trade receivables were ₹543.84 million at September 2025, of which 27.93% was more than six months past due (DRHP p.37).”
- 10Earnings qualityThere are no auditor qualifications that have not been given effect in the restated accounts (DRHP p.36).p.36
“There are no auditor qualifications that have not been given effect in the restated accounts (DRHP p.36).”
- 11
“Cash and cash equivalents were ₹4.67 million at September 2025 (DRHP p.418).”
- 12Who is sellingTogether they offer up to 900,000 shares; the split was not read for this study (DRHP p.33).p.33
“Together they offer up to 900,000 shares; the split was not read for this study (DRHP p.33).”
- 13PromotersThe promoters are Sandip Mohanbhai Sorathia, Harsukhbhai Oghadbhai Bhanderi, Pankajbhai Haribhai Bhanderi, Pravinbhai Chanabhai Sorathia, Mohanbhai Chanabhai Sorathiya and Jayantibhai Chanabhai Sorathia (DRHP p.33).p.33
“The promoters are Sandip Mohanbhai Sorathia, Harsukhbhai Oghadbhai Bhanderi, Pankajbhai Haribhai Bhanderi, Pravinbhai Chanabhai Sorathia, Mohanbhai Chanabhai Sorathiya and Jayantibhai Chanabhai Sorathia (DRHP p.33).”
- 14PromotersOne criminal proceeding involving ₹6.00 million is pending against the promoters (DRHP p.37).p.37
“One criminal proceeding involving ₹6.00 million is pending against the promoters (DRHP p.37).”
- 15What changed just before the IPOBonus issue, 28 bonus shares for each share held, allotted on 17 October 2025 (DRHP p.121).p.121
“Bonus issue, 28 bonus shares for each share held, allotted on 17 October 2025 (DRHP p.121).”
- 16What changed just before the IPOShareholders' agreement, a share subscription and shareholders' agreement dated 15 November 2025 (DRHP p.266).p.266
“Shareholders' agreement, a share subscription and shareholders' agreement dated 15 November 2025 (DRHP p.266).”
- 17What changed just before the IPOMakhecha & Associates was reappointed in September 2024 (DRHP p.113).p.113
“Makhecha & Associates was reappointed in September 2024 (DRHP p.113).”
- 18What changed just before the IPOCompany form, the company became a public limited company in September 2025 (DRHP p.522).p.522
“Company form, the company became a public limited company in September 2025 (DRHP p.522).”
- 19Capacity and expansionThe proceeds fund working capital and ₹52 million of equipment (DRHP p.34).p.34
“The proceeds fund working capital and ₹52 million of equipment (DRHP p.34).”
- 20
“The book-to-bill ratio was 1.68 in FY25 (DRHP p.152).”
- 21Market size and industry structureThe ICRA report cited in the offer document says India's construction market grew at 15.6% a year from FY2021 to FY2025 and projects 7.9% a year from FY2026 to FY2030 (DRHP p.33).p.33
“The ICRA report cited in the offer document says India's construction market grew at 15.6% a year from FY2021 to FY2025 and projects 7.9% a year from FY2026 to FY2030 (DRHP p.33).”
- 22
“A track record, 82 projects over the last decade (DRHP p.223).”
- 23
“Tenders. Most projects are won by competitive bidding (DRHP p.37).”
- 24
“PSU dependence. 79% of recent revenue (DRHP p.37).”
- 25
“Receivables. 28% more than six months overdue (DRHP p.37).”
- 26
“Customers. Ten customers were 94% of revenue (DRHP p.38).”
- 27
“Gujarat. 41% of revenue (DRHP p.38).”
- 28Litigation and regulatory mattersThe company says the order covers road works in Gujarat that are not part of its current order book (DRHP p.56).p.56
“The company says the order covers road works in Gujarat that are not part of its current order book (DRHP p.56).”
- 29Related-party transactionsThe document lists related-party transactions among its top ten risks (DRHP p.38).p.38
“The document lists related-party transactions among its top ten risks (DRHP p.38).”
- 30
“Issue | Fresh issue | 9,000,000 shares, price not set | (DRHP p.33)”
- 31
“Issue | Offer for sale | 900,000 shares by two promoters | (DRHP p.33)”
- 32
“Concentration | Top ten customers | 92.9% of FY25 revenue | (DRHP p.38)”
- 33
“Concentration | Public sector undertakings | 73.2% of FY25 revenue | (DRHP p.37)”
- 34
“Balance sheet | Debt to equity FY25 | 1.3× | (DRHP p.152)”
- 35
“Worth reading | Operating cash flow FY25 | ₹1.7 cr | (DRHP p.418)”
- 36Key figuresWorth reading | Receivables more than six months overdue, September 2025 | ₹15.2 cr | (DRHP p.37)p.37
“Worth reading | Receivables more than six months overdue, September 2025 | ₹15.2 cr | (DRHP p.37)”
- 37
“Worth reading | Cases against promoters | 1 criminal, ₹0.6 cr | (DRHP p.37)”
- 38
“Worth reading | Working-capital days FY25 | 153 | (DRHP p.152)”
- 39
“Before the IPO | Revenue FY23 → FY25 | ₹164.8 cr → ₹183.3 cr | (DRHP p.35)”
- 40
“Before the IPO | PAT FY23 → FY25 | ₹7.5 cr → ₹15.1 cr | (DRHP p.35)”
- 41
“Before the IPO | Bonus issue | 28:1, October 2025 | (DRHP p.121)”
- 42
“Before the IPO | Pre-IPO placement | ₹81 a share, November 2025 | (DRHP p.122)”
- 43Key figuresBefore the IPO | Last allotment before the IPO | ₹81 a share, November 2025 | (DRHP p.122)p.122
“Before the IPO | Last allotment before the IPO | ₹81 a share, November 2025 | (DRHP p.122)”
- 44
“Before the IPO | Auditor change | none in the last three years | (DRHP p.113)”
- 45
“Before the IPO | Converted to a public company | September 2025 | (DRHP p.522)”
- 46
“Who is involved | Industry | Construction and infrastructure | (DRHP p.33)”
- 47
“Who is involved | Promoter | Sandip Mohanbhai Sorathia | (DRHP p.33)”
- 48
“Who is involved | Promoter | Harsukhbhai Oghadbhai Bhanderi | (DRHP p.33)”
- 49
“Who is involved | Promoter | Pankajbhai Haribhai Bhanderi | (DRHP p.33)”
- 50
“Who is involved | Promoter | Pravinbhai Chanabhai Sorathia | (DRHP p.33)”
- 51
“Who is involved | Promoter | Mohanbhai Chanabhai Sorathiya | (DRHP p.33)”
- 52
“Who is involved | Promoter | Jayantibhai Chanabhai Sorathia | (DRHP p.33)”
- 53Key figuresWho is involved | Selling shareholder | Mohanbhai Chanabhai Sorathiya (promoter), shares not separately stated | (DRHP p.34)p.34
“Who is involved | Selling shareholder | Mohanbhai Chanabhai Sorathiya (promoter), shares not separately stated | (DRHP p.34)”
- 54Key figuresWho is involved | Selling shareholder | Jayantibhai Chanabhai Sorathia (promoter), shares not separately stated | (DRHP p.34)p.34
“Who is involved | Selling shareholder | Jayantibhai Chanabhai Sorathia (promoter), shares not separately stated | (DRHP p.34)”
Krishna Buildspace IPO: before the IPO
The record up to the issue and what changed in the company's capital and auditors, from the offer document.
- Revenue FY23 → FY25
- ₹164.8 cr → ₹183.3 cr
- PAT FY23 → FY25
- ₹7.5 cr → ₹15.1 cr
- Bonus issue
- 28:1, October 2025
- Pre-IPO placement
- ₹81 a share, November 2025
- Last allotment before the IPO
- ₹81 a share, November 2025
- Auditor change
- none in the last three years
- Converted to a public company
- September 2025
Krishna Buildspace IPO: checks
Factual conditions, each with a fixed threshold, read from the key figures. A condition met is a fact to read up on in the study, not a verdict on the issue; meeting none is not a verdict either.
- Profit grew much faster than revenue
Profit grew 42.0% a year against revenue's 5.5%.
- Cash flow under half of profit
Operating cash flow ₹1.7 cr against profit after tax of ₹15.1 cr in the latest year.
- Revenue depends on few customers
The top ten are 92.9%.
- Cases against promoters
Cases against promoters: 1 criminal, ₹0.6 cr.
- Working capital over 150 days
Working capital is 153 days of revenue.
Krishna Buildspace IPO: questions answered
When will the Krishna Buildspace IPO open?
No dates or price band yet. The company filed its draft offer document on 30 Dec 2025. The dates and the band come with the red herring prospectus, after SEBI has reviewed the draft.
What are Krishna Buildspace's financials?
Revenue went ₹164.8 cr to ₹183.3 cr (FY23 to FY25), 5.5% a year. Profit after tax went ₹7.5 cr to ₹15.1 cr (FY23 to FY25), 42.0% a year. All figures are from the offer document's restated statements.
How much of Krishna Buildspace's revenue comes from its largest customer?
The top ten customers 92.9% of FY25 revenue, as the offer document gives it. The study shows the years before and whether the customers are named.
What is the Krishna Buildspace IPO GMP?
newboard does not publish a grey-market premium. Grey-market deals happen outside the stock exchanges, are not regulated, and leave no public record of who traded at what price. What is on record is the offer document, read on this page, and the exchanges' bid book.
Krishna Buildspace IPO: the next step, on Telegram
A message when there is news on its price band, bidding, allotment status, listing day and use-of-proceeds reports. Free, no account, leave in one tap. Send /stop to end it.
Not on this page yet: the peer table the issuer printed. Each is added when the pipeline extracts it from the offer document.
The figures on this page are the company's own, taken from its filings with the exchanges and SEBI, and every number links to the document and page it came from. They are reproduced as stated, not verified independently, and they are not forecasts by newboard.in. Nothing here is investment advice, a research report or a recommendation. newboard.in is not a SEBI-registered research analyst or investment adviser.